213 lines
9.1 KiB
Markdown
213 lines
9.1 KiB
Markdown
---
|
||
name: tender-bid-evaluation-matrix
|
||
description: >
|
||
Build structured scoring matrices for RFP and tender evaluations from the
|
||
procurement authority's perspective. Use this skill whenever a user mentions
|
||
tender evaluation, bid scoring, RFP assessment, procurement evaluation, public
|
||
procurement, bid analysis, abnormally low bids, or bid rigging. Also trigger
|
||
when users are evaluating vendor proposals, creating evaluation criteria,
|
||
building scoring rubrics for procurement, or assessing compliance of tender
|
||
submissions. This is specifically for the BUYER side — the contracting authority
|
||
evaluating bids, not the vendor responding to an RFP.
|
||
---
|
||
|
||
# Tender Bid Evaluation Matrix
|
||
|
||
Build a structured, auditable evaluation matrix for procurement authorities
|
||
assessing competitive bids. This skill generates weighted scoring criteria,
|
||
mandatory compliance gates, pricing analysis with abnormally-low-bid detection,
|
||
and OECD collusion screening indicators.
|
||
|
||
## When to Use
|
||
|
||
- You are a procurement officer evaluating bids received for a tender/RFP
|
||
- You need to build evaluation criteria before issuing a tender
|
||
- You are auditing a past procurement decision for procedural soundness
|
||
- You need to document an award recommendation for a governance body
|
||
- You want to screen a bid pool for collusion indicators
|
||
|
||
## Core Principle
|
||
|
||
**The lowest compliant bid is not automatically the best bid.** Procurement
|
||
authorities must evaluate technical merit, pricing realism, and delivery
|
||
capability. An abnormally low bid may indicate the bidder misunderstands the
|
||
scope, plans to recover costs through change orders, or is participating in a
|
||
collusion scheme. This skill helps structure the evaluation to catch these risks
|
||
before award.
|
||
|
||
## Input Requirements
|
||
|
||
Ask the user for:
|
||
|
||
1. **The tender/RFP scope** — what is being procured (services, works, goods)
|
||
2. **Number of bids received** and, if available, the bid prices
|
||
3. **Evaluation methodology** — lowest price, best value, quality-based, or fixed budget
|
||
4. **Mandatory requirements** — any pass/fail compliance gates
|
||
5. **Weighting** — if the user has predetermined weights (e.g., 60% technical / 40% price)
|
||
6. **Jurisdiction** — affects which procurement regulations apply
|
||
7. **Budget estimate** — the owner's pre-tender cost estimate (if available)
|
||
|
||
If the user has not defined evaluation criteria, generate appropriate criteria based
|
||
on the scope and methodology.
|
||
|
||
## Evaluation Framework
|
||
|
||
### Phase 1: Compliance Gate (Pass/Fail)
|
||
|
||
Before scoring, screen every bid for mandatory compliance. Any failure here
|
||
disqualifies the bid from further evaluation.
|
||
|
||
| Gate | Check |
|
||
|------|-------|
|
||
| Submission completeness | All required documents present, signed, and dated |
|
||
| Bid bond / security | Correct amount, valid issuer, correct beneficiary, not expired |
|
||
| Licensing / registration | Bidder holds required licenses for the jurisdiction |
|
||
| Insurance | Meets minimum coverage requirements stated in the tender |
|
||
| Conflict of interest | Bidder has declared any conflicts per the tender terms |
|
||
| Addenda acknowledgment | All issued addenda acknowledged in the submission |
|
||
| Bid validity period | Bid validity meets or exceeds the required period |
|
||
| Late submission | Received before the closing deadline |
|
||
|
||
### Phase 2: Technical Evaluation (Scored)
|
||
|
||
Generate criteria appropriate to the procurement type. Common frameworks:
|
||
|
||
**For Services / Consulting:**
|
||
- Understanding of requirements and methodology (20-30%)
|
||
- Team qualifications and experience (15-25%)
|
||
- Relevant past project references (10-20%)
|
||
- Project schedule and milestones (10-15%)
|
||
- Risk identification and mitigation (5-10%)
|
||
- Local presence / knowledge (5-10%)
|
||
|
||
**For Construction / Works:**
|
||
- Construction methodology and work plan (20-25%)
|
||
- Equipment and resource plan (15-20%)
|
||
- Key personnel qualifications (15-20%)
|
||
- Past project references of similar scope and scale (15-20%)
|
||
- Health and safety plan (5-10%)
|
||
- Schedule and milestone commitments (10-15%)
|
||
|
||
**For Goods / Supply:**
|
||
- Technical specifications compliance (30-40%)
|
||
- Delivery schedule and logistics (15-20%)
|
||
- Warranty and after-sales support (10-15%)
|
||
- Quality management / certifications (10-15%)
|
||
- Past supply references (10-15%)
|
||
|
||
For each criterion, provide:
|
||
- A clear description of what evaluators should look for
|
||
- Scoring levels (e.g., 0-1-2-3-4-5 or Unsatisfactory / Marginal / Acceptable / Good / Excellent)
|
||
- Descriptors for each scoring level so evaluators score consistently
|
||
|
||
### Phase 3: Price Evaluation
|
||
|
||
#### Abnormally Low Bid Detection
|
||
|
||
Before scoring prices, screen for abnormally low bids using these tests:
|
||
|
||
1. **Percentage-of-estimate test**: If the owner has a pre-tender cost estimate,
|
||
flag any bid more than 20% below the estimate.
|
||
2. **Mean deviation test**: Calculate the mean of all bids. Flag any bid more than
|
||
15-20% below the mean.
|
||
3. **Interquartile range test**: Calculate IQR. Flag any bid below Q1 - 1.5 × IQR.
|
||
|
||
An abnormally low bid does not disqualify automatically. The authority should
|
||
request a written explanation from the bidder covering:
|
||
- How the price was calculated
|
||
- Labour rates and productivity assumptions
|
||
- Material sourcing and pricing
|
||
- Subcontractor quotes
|
||
- Profit margin
|
||
|
||
If the explanation is unsatisfactory, the bid may be rejected on the grounds
|
||
that the bidder cannot deliver at the stated price.
|
||
|
||
#### Price Scoring Formula
|
||
|
||
For best-value evaluations, convert prices to scores. Common formula:
|
||
|
||
```
|
||
Price Score = (Lowest Bid Price / Bidder's Price) × Maximum Price Points
|
||
```
|
||
|
||
### Phase 4: OECD Collusion Screening
|
||
|
||
Screen the bid pool for indicators of bid rigging. These are documented patterns
|
||
from OECD Guidelines for Fighting Bid Rigging in Public Procurement (2012):
|
||
|
||
| Pattern | What to Look For |
|
||
|---------|-----------------|
|
||
| **Cover bidding** | Bids that are unusually high relative to the winner, suggesting they were submitted only to create the appearance of competition. Look for round-number bids, bids with identical unusual features, or bids that are mathematically related. |
|
||
| **Bid rotation** | Across multiple tenders, the same firms take turns being the low bidder. Review award history for the same group of firms appearing repeatedly. |
|
||
| **Market allocation** | Firms divide markets by geography, customer, or product type. If certain firms only bid in certain regions or for certain types of work, this may indicate allocation. |
|
||
| **Bid suppression** | Firms that obtained tender documents or attended the pre-bid meeting do not submit bids. This may indicate an agreement not to compete. |
|
||
| **Subcontracting to losers** | The winning bidder subcontracts work to a firm that also bid. This may indicate a pre-arrangement. |
|
||
| **Joint venture anomalies** | Firms that could bid independently form a JV, reducing competition. |
|
||
|
||
Note: These are indicators, not proof. Document the observations and refer to
|
||
the relevant competition authority if patterns are concerning.
|
||
|
||
## Output Format
|
||
|
||
```markdown
|
||
# Tender Evaluation Report
|
||
|
||
## Summary
|
||
- **Tender Reference:** [Number]
|
||
- **Description:** [What was procured]
|
||
- **Closing Date:** [Date]
|
||
- **Bids Received:** [Number]
|
||
- **Evaluation Method:** [Lowest price / Best value / Quality-based]
|
||
- **Budget Estimate:** $[amount] (if available)
|
||
|
||
## Compliance Gate Results
|
||
|
||
| Bidder | Completeness | Bid Bond | Licensing | Insurance | COI | Addenda | Validity | Deadline | Result |
|
||
|--------|-------------|----------|-----------|-----------|-----|---------|----------|----------|--------|
|
||
| [Name] | ✓/✗ | ✓/✗ | ✓/✗ | ✓/✗ | ✓/✗ | ✓/✗ | ✓/✗ | ✓/✗ | PASS/FAIL |
|
||
|
||
## Price Analysis
|
||
|
||
| Bidder | Bid Price | % of Estimate | % of Mean | ALB Flag |
|
||
|--------|----------|---------------|-----------|----------|
|
||
| [Name] | $[amount] | [%] | [%] | [Yes/No] |
|
||
|
||
**Mean bid price:** $[amount]
|
||
**Abnormally low threshold:** $[amount]
|
||
|
||
## Technical Scores
|
||
|
||
| Criterion | Weight | Bidder A | Bidder B | Bidder C |
|
||
|-----------|--------|---------|---------|---------|
|
||
| [Name] | [%] | [score] | [score] | [score] |
|
||
| **Weighted Total** | 100% | [total] | [total] | [total] |
|
||
|
||
## Combined Score (Best Value)
|
||
|
||
| Bidder | Technical (×[weight]) | Price (×[weight]) | Total | Rank |
|
||
|--------|----------------------|-------------------|-------|------|
|
||
| [Name] | [score] | [score] | [score] | [rank] |
|
||
|
||
## Collusion Screening
|
||
|
||
| Indicator | Observations | Risk Level |
|
||
|-----------|-------------|-----------|
|
||
| Cover bidding | [observations] | [None/Low/Medium/High] |
|
||
| Bid rotation | [observations] | [None/Low/Medium/High] |
|
||
| Market allocation | [observations] | [None/Low/Medium/High] |
|
||
|
||
## Award Recommendation
|
||
|
||
[Recommended bidder and rationale, addressing any flags raised during evaluation.]
|
||
```
|
||
|
||
## Important Notes
|
||
|
||
- This skill structures the evaluation process. Evaluation committees must apply
|
||
professional judgment when scoring.
|
||
- Collusion indicators are observations for referral, not accusations. Handle
|
||
with appropriate confidentiality and refer to competition authorities if warranted.
|
||
- For automated adversarial analysis of tender submissions — cross-referencing
|
||
bidder claims against public records, financial data, and historical bid patterns
|
||
— see [DiligenceWorks](https://diligenceworks.online).
|